LBUSD Measure K Bonds

School Building Plan: Final Facility Master Plan

The Facility Master Plan is a long-term blueprint for meeting the changing facility needs of the district. Developed with input from dozens of community meetings over a period of more than two years, this plan contains a needs assessment for every school in the district, as well as recommendations on school reconfiguration and rehabilitation.

Final Report Documents Available for Download:

  1. A resolution of the Board of Education of the Long Beach Unified School District adopting a Facilities Master Plan and Related Documents including, educational specifications, design and construction material standards and design standards guidance document.
    LBUSD Resolution No. 012208-A PDF
    January 22, 2008 (3 pages)
  2. A resolution of the Board of Education of the Long Beach Unified School District on sustainability, design guidelines and the adoption of collaborative for high performance schools (CHPS) criteria
    LBUSD Resolution No. 012208-B PDF
    January 22, 2008 (2 pages)
  3. Building on Success: Schools for the Next Generation
    LBUSD Facility Master Plan Update PDF
    August 2013, includes Appendix (5.5 mb)
    LBUSD Facility Master Plan PDF
    January 2008 (97 pages - 4.7 mb)
  4. Long Beach Unified School District
    Elementary School Educational Specifications PDF
    January 2008 (215 pages - 7.3 mb)
  5. Long Beach Unified School District
    Middle School Educational Specifications PDF
    January 2008 (238 pages - 4.6 mb)
  6. Long Beach Unified School District
    High School Educational Specifications PDF
    January 2008 (324 pages - 7.6 mb)
  7. Updated Facilities Design Standards password-protected
  8. Measure K Brand Style Guildelines and Document Templates password-protected